June 2022 Update

Share On

This is rare to say for a construction project in the current environment, but at this site set-up and prep phase, we're completely on track this month, and actually - it gets even better: we are ahead of where we'd programmed for some jobs by 1 - 2 weeks. A significant number of materials have/are being delivered to site this month (including steel studs, the much talked about GIB linings and structural reinforcement).


What's coming up next month:

Most structural work for Avalon Apartments starts early July, as you can see from the scheduled work below:


Strengthening:

• Level 9 strengthening.
• Basement strengthening.
• Concrete pour on the ground floor.


Exterior works:

• External windows demolition.
• Scaffold construction.


Fit-out works:

• Majority of apartment wall framing complete, and one side wall framing to have a gib sheet attached.
• Framing for apartment ceilings starts.
• Start the installation of services (plumbing, ducts for ventilation and exhausts, fire sprinkler and hydrant systems).


Consents:

All required building consents have been approved, and the resource consent requirements are actively being closed out by the project team members.


Below is a selection of photos (taken 17th June) of each level from the ground up.

 

 

Steel studs arriving in preparation for structural work to commence in July. 

 

 

Ground Floor

 

 

Level 4

 

 

Level 5

 

 

Level 6

 

 

Level 7

 

 

Level 8

 

 

Level 9

 

 

A close up of the framing.

 

 

 

Ongoing contact:

If you have any questions at all, please contact your sales agent: 

 

Redcoats Professionals: shane@redcoats.co.nz or 021 459 622

The Wellington Company: Rakesh.Champaneri@twc.co.nz or 021 175 0490

 

 